Skip to content
Big Rob's
Hauling

By Rob · Updated November 25, 2026

Shed, Deck and Screen Enclosure Tear-Outs in Orlando

Tear-outs in Orlando, FL: sheds, decks, pool screen enclosures, fences and interior demo taken down and hauled in one visit, with a flat quote first.

5.0 · 127 Google reviews · Davenport to Orlando

Kubota skid steer with a breaker attachment breaking up a concrete patio in Polk County, FL

A tear-out in Orlando with Big Rob's Hauling is one visit. We take it down, load it as it comes apart and haul it off. That covers sheds, wood decks, pool screen enclosures, fences, old landscaping and interior demo like drywall, ceilings and flooring. You get a flat quote first, from photos or a walkthrough, and it includes the haul-off. Orlando is a scheduled run from my yard in Davenport, usually next day, and bigger tear-outs get booked a few days out.

What do you tear out?

JobHow it comes down
ShedsEmptied first if needed, then roof, walls, floor. Resin unclips, wood gets cut to trailer size, metal folds flat.
Wood decksBoards pried up, joists cut, posts pulled or cut at grade. Rotten decks come apart fast.
Pool screen enclosuresScreen cut out, aluminum frame taken down in sections, gutters and doors with it.
FencesPanels and pickets down, posts pulled, the line left ready for the new fence.
LandscapingOld beds, shrubs, small palms and edging pulled out with the grapple.
Interior demoDrywall, ceilings, flooring, cabinets and fixtures taken out and bagged or loaded straight to the trailer.
ConcretePatios, walkways, a shed slab or a driveway broken up on site and hauled by dump-truck partners.

Big trees, anything structural on the house and anything holding up a roof that's still in use are not my crew's work. For those I bring in a contractor partner, or I tell you who to call.

How does a tear-out day run?

  1. I see it first. Send photos from a few angles and one of the path from the street, or I'll walk it. I'm checking the size, what it's made of, the gate width and where the trailer can park.
  2. You get one flat number. Teardown and haul-off together. Concrete is its own line if it's going.
  3. We show up with the trailer. Small jobs get hand tools and saws. The stand-on mini fits through most backyard gates, and the track loader with the grapple handles the bigger jobs.
  4. Down and loaded as we go. Nothing gets stacked in your driveway for a week. Nails and screws get raked and picked up where the structure stood.
  5. Walk it and pay. You look at the spot, we answer anything, and you pay when it's done.

What does a tear-out cost in Orlando?

It's quoted per job, because a 6×8 resin shed and a 400-square-foot deck aren't close. Three things set the number:

  • Size and material. Pressure-treated decks and wood sheds with shingles are heavier and slower than resin or thin metal. Tile from interior demo carries an extra dump fee.
  • How much debris. Everything we load goes on the same trailer price list as a junk pickup, so a bigger tear-out is more trailers.
  • Access. A wide side gate and a short carry cost less than a narrow gate, a long backyard or a second floor.

A tear-out that's already taken apart and stacked is just a pickup, priced by how much of the trailer it fills, from $175 for a 1/8 load. The Orlando junk removal cost page has the full list. The two reviews below are about this kind of work:

5.0 · 127 Google reviews · Davenport to Orlando

Where do you do tear-outs?

All of Orlando, from Pine Hills and MetroWest to College Park, Conway and Lake Nona, plus the towns around it. Pages by town: demolition in Orlando, Winter Park, Winter Garden, Kissimmee, St. Cloud and Apopka. For a single job type: shed removal in Orlando, concrete removal in Orlando, deck removal, fence removal and interior demolition. For the slab under it, see how to remove a concrete patio or driveway.

How do I get a number?

  • Text photos to 863.225.2147: the structure, what it sits on, and the way in from the street.
  • Call (863) 225-2147 and tell me what's coming down.
  • Fill out the quote form and I'll call you back.

5.0 stars on 127 Google reviews.

Questions

Quick answers

Do you haul away what you tear out?

Yes, on the same visit. The dump trailer is parked by the job, the crew loads as it goes, and nothing gets left at the curb. Concrete is the one exception. It's broken up on site and hauled by my dump-truck partners, because it doesn't ride in my trailers.

Can you take down a pool screen enclosure?

Yes. The screen gets cut out, the aluminum frame comes down in sections, and it all leaves on the trailer. The deck or slab under it stays unless you want that gone too. If the enclosure ties into the house roof or the job needs a permit, I bring in a contractor partner for that part.

How is a tear-out priced?

Flat, quoted from photos or a walkthrough before we start. Taking it down and hauling it off are both in the number. Debris goes by the same trailer prices as any junk, $175 for a 1/8 load up to $700 for a full trailer, and teardown time is figured into the quote.

Do you pull permits?

No. Small-structure demo is what my crew does. When a job needs a permit or a licensed contractor, I work with a general contractor partner, and I tell you that before I quote. Check with your city or county about your own job first.

Ready for it to be gone?

Orlando runs are scheduled, usually next day. Call, or text a photo of the pile and Rob sends back a flat quote.

5.0 · 127 Google reviews · Davenport to Orlando

(863) 225-2147Get a Quote