Rob is awesome! Came within 2 days to pick up excess wood from a deck repair and cleaned it all out quickly. Price was fair as well. Thanks Rob and team!
Kim Tricker · this year
Demolition & Removal · a straight comparison
A deck with a few soft boards is a repair. A deck with rotted joists, posts or a ledger pulling off the house is a tear-out. Across Central Florida the repair is priced by the board and the tear-out is one flat demo-and-haul number, usually a half trailer at $350 or a full at $700, with the wood gone the same visit.
5.0 · 119 Google reviews · Davenport & Polk County

| Repair it | Tear it out and haul it | |
|---|---|---|
| What you find | A few soft or split boards, solid framing underneath | Rotted joists, wobbly posts, a ledger pulling away, or termite damage |
| Cost shape | By the board, plus the labor to swap them | One flat demo-and-haul quote: half trailer $350, full $700 |
| Time | An afternoon per section, repeated as more boards go | A morning to a day, then it's gone |
| What comes after | The same deck, a little longer | A new deck, pavers, or lawn on bare ground |
| Permits | Ask the building department if the repair reaches the framing | Ask the building department; when the job needs one, Rob works with a general contractor |
| What happens to the wood | Old boards go in your trash or a dump run | Landfill. Treated lumber isn't donated |
Repair when the problem is on top. Walk the deck and push on the boards. If a handful flex or split but the joists under them are hard when you poke them with a screwdriver, swap the boards and tighten the railings. Same for a loose stair tread or a railing post. You keep the deck and spend a fraction of what a new one costs.
Tear it out when the problem is underneath. Joists that crumble at the screwdriver, posts that move when you lean on the rail, a ledger board separating from the house, or termite trails in the framing mean the boards on top don't matter. Patching over rotted framing buys a season and hides the risk. Rob's crew takes it down in order: railings and stairs, then boards, then joists, then posts and footings. The wood is loaded as it comes off, so the yard is clear when the trailer leaves.
Decide what goes in the footprint before demo day. A new deck may want the old posts left in; say so and the crew leaves them. Pavers or lawn want everything out, footings included. The skid steer pulls posts set in concrete, and those footings ride in the trailer with the lumber. Ask your city or the Polk County building department about permits for the tear-out and for whatever's next. When a job needs one, Rob works with a general contractor.
Old deck lumber goes to the landfill. It's treated, so it isn't donated and it shouldn't be burned. Composite goes the same way. If a contractor rebuilt and left the old boards in a pile, that's a regular pickup priced by how much trailer it fills.
One worked example
Against the criteria above, with the review evidence, verbatim.
Big Rob's does the tear-out side. One flat number covers the demo, the loading and the haul, quoted from photos and a rough size. Deck wood is bulky but light, so the price follows trailer volume more than weight, and the crew loads as they go so nothing waits in the yard. Footings add a little weight and go along in the trailer.
The reviews below cover a deck-wood pickup and a small job whose price held. That's the shape of the quote whether it's a landing or a wraparound.
Rob is awesome! Came within 2 days to pick up excess wood from a deck repair and cleaned it all out quickly. Price was fair as well. Thanks Rob and team!
Kim Tricker · this year
Very professional,reasonable fair price, fast, no job to big or small,patient, and came same day which I really appreciate..didnt have huge amount to haul but they still kept price exact same with no bait& switch. Overall 5*
Cheryl Scotland · this year
Questions
Poke the joists and posts with a screwdriver. Solid framing means the boards on top can be swapped. If the screwdriver sinks in, the framing is done and the deck should come out.
It's one flat number from photos. Most decks land at a half trailer, $350, or a full, $700, with the demo and haul included. A very large or multi-level deck can take more than one load, and Rob says so before he starts.
Yes. Tell Rob you're rebuilding on the same posts and the crew leaves them. If you're going to pavers or grass, they pull the posts and footings too.

Call before noon and it's usually gone today. Or text a photo of the pile and Rob sends back a flat quote.
5.0 · 119 Google reviews · Davenport & Polk County